Page 1 - Submittals
P. 1
SUBMITTAL COVER SHEET
PROJECT NAME: DATE: 9-Jun-25
SUBMITTAL TITLE: SUBMITTAL No 003
CONTRACTOR: CONTRACT No
ENGINEER: CLIENT:
Shop Drawing Method Statement O&M Manual
APPROVAL Samples Programme As Built drawing
REQUIRED FOR
Material & product data Test Reports Other
ITEM DESCRIPTION NO COPIES REMARKS
SUBCONTRACTOR / MANUFACTURER / SUPPLIER:
For Contractor Engineer's Representative
Signature: ………………........................……...…… Signature: …………....................……………….…… Signature …………………….…
Engineer Project Manager Engineer ABC Ltd
Date: Date: Rcv'd Date:
ENGINEER'S COMMENTS:
APPROVED A APPROVED AS NOTED B NOT APPROVED C FOR RECORD ONLY R
Engineer's Representative For Contractor
Name Surname Signature ………………….............….… Name Surname Signature …………….........…………
Engineer ABC Ltd Date: Project Manager Rcv'd Date: