Page 1 - Submittals
P. 1

SUBMITTAL COVER SHEET



              PROJECT NAME:                                                                          DATE:    9-Jun-25
              SUBMITTAL TITLE:                                                                SUBMITTAL No      003
              CONTRACTOR:                                                                      CONTRACT No

              ENGINEER:                                                          CLIENT:

                                      Shop Drawing                 Method Statement               O&M Manual
              APPROVAL                Samples                      Programme                      As Built drawing
              REQUIRED FOR

                                      Material & product data      Test Reports                   Other


               ITEM                             DESCRIPTION                            NO COPIES      REMARKS






















              SUBCONTRACTOR / MANUFACTURER / SUPPLIER:

              For Contractor                                                                Engineer's Representative

              Signature:  ………………........................……...……    Signature:  …………....................……………….…… Signature …………………….…
                                Engineer                              Project Manager             Engineer ABC Ltd
                      Date:                            Date:                                Rcv'd Date:

              ENGINEER'S COMMENTS:













                  APPROVED        A     APPROVED AS NOTED       B     NOT APPROVED       C     FOR RECORD ONLY      R
              Engineer's Representative                            For Contractor
                   Name Surname       Signature ………………….............….…  Name Surname       Signature …………….........…………
                  Engineer ABC Ltd    Date:                              Project Manager    Rcv'd Date:
   1